--- title: "Requesting a draw" slug: "creating-a-draw-sponsored-borrower" updated: 2026-09-23T15:40:38Z published: 2026-09-23T15:40:38Z canonical: "help.getbuilt.com/creating-a-draw-sponsored-borrower" stale: true --- > ## Documentation Index > Fetch the complete documentation index at: https://help.getbuilt.com/llms.txt > Use this file to discover all available pages before exploring further. # Requesting a draw ### **Overview** This article walks Sponsored Borrowers through the full process of requesting a draw in the Sponsored Borrower Portal — from naming the draw, through uploading documentation, entering funding amounts, reviewing, and submitting for lender review. You'll start the request from the deal's **Draws** section and move through a multi-step wizard that adapts to your answers about reallocations, and retainage. --- ### **Open the request draw flow** 1. At the top-left of the page, click **Portfolio**. 2. On the **Portfolio** page, click **View** or the **Deal Name** for the deal for which you want to request a draw. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image(783).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=zAJjxEFnI3YgQ6sDSAsMgSASngD4jheA6uqCAWM%2FdJY%3D) 3. Scroll down to the **Draws** tab. 4. Click **+ Request Draw**. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image(784).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=LiLTgsC2tqaiszeUQY7Yu14VVyDNQ0BBgRW3Py2%2Fjkg%3D) 5. The **New Draw Request** wizard opens. --- ### **Step 1: Details** On the **Details** screen, tell us a little about this draw request. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-3ACWV8AA.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=gmAG8PYnkee8jOpOcI54C6MDrsqFfB9DqcDUgQW7i6M%3D) - **What's a good name for this Draw?** Enter a name for the draw. Most people use the draw number. - **Is this the final Draw on this project?** Select **Yes** or **No**. Depending on your lender's draw workflow, a final draw may require more or less information than other draw types. - **Are you making any budget changes this draw?** Select **Yes** if you need to reallocate line items or add new Uses or Sources. Selecting **Yes** adds a **budget changes** screen to this flow. - **Is retainage being withheld or released this Draw?** Select **Yes** if retainage applies to this draw. Selecting **Yes** adds a retainage screen to this flow. Click **Next** to continue. --- ### **Step 2: Documentation** On the **Documentation** screen, upload your draw documentation and backup. Choose how you'd like to upload your documentation: ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-H0LUCV40.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=tM4JP35cu85%2B0PjhSYLso%2FY3zpPoOIXwZXchLbVewP0%3D) - **Let Built organize everything for me** — upload your draw package and Built will sort, split, and attach documents to their relevant line items. - **I'll upload and assign manually** — upload documents and manually attach each file to the required items. Select a method, then click **Next**. > [!NOTE] > Note: > > - **Availability is set per lender.** If **Let Built organize everything for me** isn't enabled for your lender yet, the card shows a **✦ Coming Soon** badge and can't be selected. Use **I'll upload and assign manually** instead. > - **Choose before you upload.** Once any file is uploaded, the method is locked for that draw and can't be changed. To use the other method, choose it at the start of your next draw. Here's how the two options differ: | | Let Built organize everything for me | I'll upload and assign manually | | --- | --- | --- | | **Assigning documents to requirements** | Built matches each document to the requirement it satisfies. | You choose the requirement for each file from the **Assign Requirement** dropdown. | | **Documents combined in one file** | Built separates the file and labels each document inside it. | You split the file yourself using the file splitter, entering page ranges and types. | | **Draw amounts** | Pre-filled from your documents, with the source file and page behind each amount. Every amount stays editable. | You enter each amount yourself. | #### Let Built organize everything for me Built reads the documents, separates them when several are combined in one file, labels each one, checks them against the documents your lender requires, and fills in draw amounts on your budget. Built's agents make the first pass — you confirm or change every placement before submitting. 1. Review your lender's requirements alongside the drop zone: - **Required Documentation** — the documents your lender requires. A check appears beside each one once a matching document is identified. If your lender has none configured, this reads *No document requirements configured for this draw.* - **Additional Requirements** — your lender's requirements that have no document attached. Set each one to **Mark Resolved** or **Not Applicable**. Uploading files won't satisfy these. If your lender has none configured, this reads *No additional requirements configured for this draw.* 2. Drag your package into the drop zone, or click **browse your files** to select it from your computer. You can drop one file or many in a single action. Supported formats: .bin, .csv, .doc, .docx, .html, .jpeg, .jpg, .json, .mp3, .pdf, .png, .svg, .tiff, .txt, .xls, .xlsm, .xlsx, .xltx, .xml, .zip. Max file size: 1 GB. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-XOF6ZPSF.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=kRFGssdGgX76%2FPMl3057Oi3p8kvpMUvxaM%2FUpZ1Gg7o%3D) 3. Watch your files process. Each file shows a card headed **Built is organizing your package** with a percentage and five steps: A file that fails to upload offers **Retry upload** and **Remove file**. Completed files are listed under **Documents Uploaded** — deleting a file there also removes it from processing. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-BFYY5MMQ.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=0MB8Fw4n5WiJO%2BUoGvWJgYvJlAWtG0AstiXDw%2FtknAA%3D) - Uploading documents - Reading draw package - Splitting documents - Extracting document information - Classifying document types 4. When processing finishes, review the **Extracted Documents** panel. There's one row per lender requirement, and each row carries a badge: | Badge | What it means | | --- | --- | | **N Documents Identified** | At least one document was matched to this requirement. | | **Missing** | No document matched this requirement, and it hasn't been marked not applicable. | | **Not Applicable** | The requirement was marked as not applicable for this draw. | | **N Documents** | Appears on the **Supplementary Documents** row only. | Two documents are shown per row; the rest sit behind an expand control. Each document shows its page range, such as `p. 3-4`. Click a document to open it — a document split out of a merged PDF opens at exactly its pages, not at page 1 of the whole upload. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-B8TYKGKQ.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=4nHPhbUqi0X9ocrW%2Fv4zbAxlR8lOE1%2BCQC18dnI1v2s%3D) 5. Optionally, rate how Built classified your documents. Identified rows carry thumbs-up and thumbs-down controls, and the same control appears in the document viewer toolbar as **Built classified this as {type} · Correct?**. Selecting either opens a **Help us improve this result** dialog where you can choose a reason and add an optional comment. Ratings are saved with the draw and never affect your submission. 6. Click **Continue**. If your files changed since Built last processed them, a **Finalizing your draw — Matching documents and updating your budget** modal steps through **Matching documents to budget line items**, **Preparing results**, and **Updating the Budget**. If your files haven't changed, the existing result is reused and no new processing runs. > [!NOTE] > Note: > > - **You can leave the page once your files are processing.** While a file is still transferring, **Save & Close** and **Cancel** are blocked — wait for the transfer to finish. Once a file shows as processing, the work continues unattended and you can safely leave the page. > - **Nothing is lost if Built doesn't match a document to a requirement.** Documents Built recognized that none of your lender's requirements asked for are grouped in a trailing **Supplementary Documents** row. A file Built couldn't classify at all gets no row in **Extracted Documents** and stays in the **Documents Uploaded** list. Either way, the document is still attached to your draw and still visible to your lender. #### I'll upload and assign manually To upload your documents: 1. Drag and drop your files into the upload area, or click **browse your files** to select them from your computer. Supported formats: .bin, .csv, .doc, .docx, .html, .jpeg, .jpg, .json, .mp3, .pdf, .png, .svg, .tiff, .txt, .xls, .xlsm, .xlsx, .xltx, .xml, .zip. Max file size: 1 GB. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-1780344802959.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=gWWSLRARG3ZPzwHyUvtFhJEvFMgUg%2Bru3%2BKCVGmzg%2Fc%3D) 2. For each uploaded document, click the **Assign Requirement** dropdown and choose the required item this file satisfies. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-1780344824096.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=0iOIkTsIeiudoq9Eh%2FrQbOx1W4p%2BUkDlqNsvlOwo%2FB8%3D) 3. If a single document needs to satisfy multiple required items, use the file splitter: 1. In the **Documents Uploaded** list, hover over the document you want to split. Click the **pencil** icon (tooltip: **Edit file**). ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-1780344846676.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=dpC1lCN%2BGti8ZGRw%2B9SoViolPJ%2B%2FK3vMyo41ubYrtZ8%3D) 2. In the **Documents** sidesheet that opens, toggle on **Separate Types by Page**. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image(842).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=iMnKBGfg0YN9C2fQvoUIYYtlcfS5PV%2FL2fBRONOubJE%3D) 3. Enter the page ranges and the requirement each range fulfills: ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image(843).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=WJg7j%2FyvARQzdbpWbDxX%2FLHvL4ZCYBhhTQ2%2B6kp2Yzc%3D) - **Pages** — Enter the page numbers or ranges (for example, `1-3` or `5`). - **Types** — Select the Required Documentation item these pages satisfy. 4. To add another page range, click **+ Add Page Range**. 5. Click **Save**, then click **Confirm**. The split creates separate files in the **Documents Uploaded** list, each assigned to its corresponding requirement. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image(844).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=bgtgZ%2BRSfp0bLXfej8eIeo63l4skGkrbQiGFTRlZmeg%3D) The right panel shows two sections: - **Required Documentation** — items configured by your lender for this job (for example, Stored Material Log, Retainage Log, Partial Conditional Lien Waiver, Proof of Payment, Hard Cost Invoices). For each item, a green check mark will appear once it’s been uploaded. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-1780344890379.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=yIEm2vvrmxRLTMPxO7LoEdeKoTI82Es%2Fq2gyjYqtRHw%3D) - **Additional Requirements** — any additional requirements from your lender. Use the dropdown to set the status to **Incomplete**, **Mark Resolved**, or **Not Applicable** for each requirement. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-1780344921768.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=m56dG2%2FwXIGxUUCcd1wWOXaq%2BYSNyMMgQvUfFkrGCeE%3D) Click **Next** to continue. --- ### **Step 3: Draw and Funding Amounts** The screens you see in this step depend on the answers you gave on the **Details** screen. #### Budget Changes (if you selected Yes to Budget Changes) On the **What budget changes are you making this Draw?** screen, reallocate existing line items or add new Uses and Sources. Sources and Uses must be balanced before you can continue. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-RF2ZUJOX.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=M%2B5OMx4Pkn3E%2Bj6da27PBHceAnb7FTjTP3SC14GMOfU%3D) - **Reallocate a line item:** In the **Draw Amounts** table, enter the change in the **Current Adjustment** column for the line item you want to reallocate. The **Revised Amount** column updates automatically. Use the **Search line items** field to find a specific line. - **Add a new Use:** Click **+ New Use(s)** above the Draw Amounts table. Select a **Type** from the dropdown, enter a **Description**, and enter the amount in the **Current Adjustment** column. To remove a new Use before you continue, click the trash icon at the end of the row. - **Add a new Source:** 1. Click **+ New Source(s)** above the Sources table. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-7QN1X13Y.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=3qwss%2F0HFqZBN2VQv2kw76Krom45CZbnK3E3FuTztco%3D) 2. In the **Add a new source** confirmation dialog, click **Add Source**. Once added, a new Source can't be edited or removed. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-A7R4RS53.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=99DaDPhEC%2FwRYMBWDZZJNcemPajksgVulxf6LbhCyqI%3D) 3. In the **New Funding Source** sidesheet, complete the required fields on the **Summary** tab: **Classification**, **Type**, **Capital Provider**, **Name**, **Total Amount**, and **Primary Source**. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-6URTGHA0.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=inB%2FiXIkzPbs0mUvEuKUeAealLGH2yoTNeK%2F%2BNvv%2Byo%3D) 4. Optionally complete the other sections in the sidesheet (Servicing Information, Dates & Fees, Interest Rate Terms, Structure, Amortization Terms, Prepayment, Call Protection, Lockbox & Cash Management, Risk & Credit Classification). 5. Click **Create**. Click **Next** to continue. --- #### Retainage (if you selected Yes to retainage) On the **What retainage is being withheld or released this Draw?** screen, enter the retainage details for each construction line item. 1. For each line item, enter values in: - **Total Retainage** — Refer to line 5 on the G702 or column I of the G703. - **Retainage this Draw** — the amount of retainage to withhold this draw. - **Retainage Released** — the amount of retainage to release this draw.![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image (27).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=1hLtWLEVgUcZlvpY1NVCPDTxM5PXhx%2F5JyOwjTgbgWI%3D) 2. Click **Next** to continue. > [!NOTE] > Retainage Tips > > For items you're managing through a Pay Application, refer to your G702/703 to enter retainage amounts. > > - **Total Retainage**: Refer to line 5 on the G702 or column I of the G703. > - **Retainage Withheld**: Calculated based on Total Retainage this Draw – Total Retainage from the previous draw. > - **Retainage Released this Draw**: The amount of retainage you're requesting to be released with this draw. --- #### Draw amounts On the **What are you requesting this draw?** screen, enter the amounts you'd like to request for each budget line item. > [!NOTE] > Note: > > - **If you chose Let Built organize everything for me, these amounts arrive pre-filled.** A banner reads *Built filled the highlighted amounts from your documents. Fields with ✦ came from extracted data — you can override any draw amount, or open the file icon on any line to view its supporting document.* Open the file icon on a line item to see the file name, page number, confidence, extracted amount, role, vendor, and reasoning behind the amount. The current draw request is always filled in where a matching line item exists; reallocation adjustments and retainage are filled in only where the draw is configured for them. > - **Edited amounts aren't re-checked.** Changing an amount Built filled in saves that edit, and the edit is what gets submitted — but the supporting reasoning isn't regenerated. The source documents panel still shows the reasoning behind the original extraction. 1. In the **Draw Amount** column, enter the amount you want to request for each line item. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-1780345003419.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=3Yhoqvg2QYX58qq%2BlQMgm%2BaNfkXOek60LC7Nx%2FKKWa4%3D) 2. Use the **Search line items** field to find a specific line. 3. Click **Next** to continue. #### Funding amounts On the **How will this draw be funded?** screen, assign funding amounts to each source until they match your draw totals. Funding amounts are pre-populated based on your lender's funding rules and eligibility rules — you can adjust them as needed. 1. In the **Sources** table, review the pre-populated **Funding Amount** for each source. ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image-MDXX6443.png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=ly%2BS9hncVmQ%2B99pS23RvRKGI5KcX8yBx3ZU4rnrfr7Q%3D) 2. To change an amount, click into the **Funding Amount** field for that source and enter a new value. The **Remaining to Fund** column updates automatically. 3. Make sure the total Funding Amount matches your total Draw Request. If they don't match, a warning banner appears explaining what to adjust (for example, *"Draw funding amount is not balanced with sources funding amount."*). When balanced, the warning disappears. 4. Click **Next** to continue. > [!NOTE] > Note: > > - The funding source amounts you enter here are a recommendation. Your lender has the final say on how funding is allocated across sources when they review the draw. --- ### **Step 4: Review** On the **Review** screen, confirm everything you've entered: ![](https://cdn.document360.io/b8e7a68c-6af4-4b6e-8d8d-23371810eaa1/Images/Documentation/image(847).png?sv=2026-02-06&spr=https&st=2026-11-24T06%3A46%3A51Z&se=2026-11-24T07%3A46%3A51Z&sr=b&sp=r&sig=dREJ4fu46ekHSiHMayp2s7JDxFnmY9dRLZMxYcTB2As%3D) - **Requested this Draw summary**, including Requested this Draw, Funded to Date (if Approved), and Remaining to Fund (if Approved). - **Hard Costs summary**, including Hard Costs Requested this Draw, Hard Cost Funded (if Approved), Hard Cost Funded %, and Hard Cost Contingency Utilization. - **Retainage summary,** including Retainage Calculated this Draw, Retainage Released this Draw, and Total Retainage. - **Soft Costs summary,** including Soft Costs Requested this Draw, Soft Cost Funded (if Approved), Soft Cost Funded %, and Soft Cost Contingency Utilization. - **Draw Amounts** table — review each line item's Original Amount, Current Adjustment, Revised Amount, Draw Request, Funded to Date, and Remaining to Fund. - **Sources** table — review funding sources for this draw. If you need to make changes, click **Back** to return to an earlier step. When everything looks correct, click **Submit Draw**. Then **Submit Draw** again on the confirmation modal. --- ### FAQ #### What happens if I select Yes to budget changes or retainage on the Details screen? Selecting Yes adds an extra screen to the draw flow where you can enter reallocation or retainage details. If you select No, those screens are skipped. #### What file types can I upload? Supported formats are .bin, .csv, .doc, .docx, .html, .jpeg, .jpg, .json, .mp3, .pdf, .png, .svg, .tiff, .txt, .xls, .xlsm, .xlsx, .xltx, .xml, and .zip. Maximum file size is 1 GB. #### Can one document satisfy multiple required items? Yes. If you're uploading manually, use the file splitter to assign specific pages of a document to different required items. See the splitter steps under **Step 2: Documentation** above. If you chose **Let Built organize everything for me**, Built separates merged documents for you and groups each one under the requirement it satisfies. #### Can I switch between the two upload methods? Not once you've uploaded a file. Your choice locks as soon as the first file lands on that draw. You can choose the other method at the start of your next draw. If **Let Built organize everything for me** shows a **✦ Coming Soon** badge, it isn't enabled for your lender yet and can't be selected. #### How long does it take Built to organize my package? Usually a few minutes, longer for large packages. Reading and organizing a typical package takes around three minutes, and the final matching step averages around two and a half. Processing time scales with package size. Once your files show as processing you can leave the page and come back — the work continues. #### Which documents can Built recognize? Every document type your lender can choose when they configure their borrower submission requirements. Anything outside those requirements is still uploaded and still visible to your lender — it's grouped under **Supplementary Documents** rather than against a specific requirement. #### Do I need to upload standing documents every draw? Yes. Each draw is assessed on its own, and documents from earlier draws don't carry forward. A document such as a Change Order Log has to be included again with every draw. #### Why does a requirement still show as incomplete after I uploaded everything? Either the document you uploaded wasn't recognized as that type, or it's a requirement with no document attached. Requirements under **Additional Requirements** are ones you mark yourself as **Mark Resolved** or **Not Applicable** — uploading files won't satisfy them. #### How do I give feedback on how Built classified a document? You can rate a whole category from the **Extracted Documents** panel, or open an individual document and rate it from the viewer toolbar, where the control reads **Built classified this as {type} · Correct?**. Ratings from either place stay in sync. Selecting a thumb opens a **Help us improve this result** dialog: - **Thumbs down reasons** — Wrong type, File missing, Not relevant, Pages incorrect, Not helpful. The comment box reads *Tell us what didn't work or what you expected instead.* - **Thumbs up reasons** — Correct type, All files present, Relevant, Pages correct, Helpful. The comment box reads *Tell us what worked well.* Reasons are single-select — choosing a second replaces the first. The comment is optional, and you can submit with no reason and no comment. Clicking the thumb that's already active clears the rating; there's no neutral state. Ratings are saved with the draw and are visible again when you return, and they never affect your submission. Rating from the viewer applies to every requirement row that shares that file. #### Why don't some rows have a thumbs up or thumbs down? This is expected, not a missing feature. Thumbs don't appear on the **Supplementary Documents** row, on rows with no identified documents, or on rows where Built can't attach a rating to a specific classification. #### Does letting Built organize my package change what my lender sees? Your lender receives the same draw with the same documents — plus, on each budget line item, the file and page each amount came from. #### What does Not Applicable do on a required documentation item? Marking a required item as **Not Applicable** tells your lender that this requirement doesn't apply to this draw. The item is removed from the Missing list. #### Do I have to e-sign every draw? No. The E-sign step only appears if your lender has configured this draw to require borrower signature. #### Can I save a draft and come back to it later? Yes — use **Save and close** at the top-right of the wizard. Your draft will appear in the deal's Draws table with a status of **Draft**, and you can pick up where you left off. #### Where can I view a draw ticket? Go to the Overview tab, scroll down to the Draws section, and click the draw name to open it. Once the draw is open, you’ll see the Draw Ticket button in the upper-right corner. #### Where can I view a draw package? Go to the Overview tab, scroll down to the Draws section, and click the draw name to open it. Once the draw is open, you’ll see the Download button (cloud with arrow icon) in the upper-right corner. Click it, then select Draw Package. #### Where can I view Draw History? Go to the Overview tab, scroll down to the Draws section, and click the draw name to open it. Once the draw is open, you’ll see the Download button (cloud with arrow icon) in the upper-right corner. Click it, then select History.